war44 Register Today Links

Go Back   War44 > Normandy > The Atlantic Wall > Merville Battery

Merville Battery Pictures and Stories Relating To Merville Go In Here


Merville battery

Merville Battery


Reply
 
LinkBack (2) Thread Tools
  2 links from elsewhere to this Post. Click to view. #1 (permalink)  
Old 09-25-2006, 08:00 PM
Jim's Avatar
Admin
 
Join Date: Sep 2006
Posts: 1,951
Merville battery

Impossible mission for the British parachutists

The 9th Parachutist Battalion dropped in Normandy on 6 June 1944 under the cover of darkness. Lieutenant-colonel Otway trained his troops for months to take the Merville battery. The parachutists knew every detail of the German defences. On D-day the operation began in a tragic way : many parachutists drowned in the marshes, the wind scattered the men on a wide area and the main part of the heavy equipment was lost. However the Red Devils launched the attack, they conquered the blockhouses of the battery one after the other. At 5:00 am all was finished, the parachutists took a layback position in Le Plain and Le Hauger. In this area the 6th Airborne Division renewed with the Operation Paddle on 17 August. The Belgian Brigade under Colonel Piron captured the strongpoint of le Moulin du Buisson and reached Merville and Franceville, cleared of enemy. In the evening the Belgian stopped in front of Le Home still occupied by the German troops. Le Home is liberated the next day on 18 August.
Reply With Quote Top
  #2 (permalink)  
Old 06-14-2008, 01:03 AM
Jim's Avatar
Admin
 
Join Date: Sep 2006
Posts: 1,951
The battery commander was Leutnant (2nd Lt) Raimund Steiner, who spent much of his time at an observation post on the coast; his second-in-command was Oberfeldwebel (Sgt-Maj) Hans Buskotte. Casemate No I was a Type 611 and consisted of the gun housing, access corridor and two ammunition stores (one for shells and one for cartridges), a shelter for 9 artillerymen, a gas extraction chamber and a machine-gun embrasure covering the rear. It was 15.5 m long and required over 1,330 cubic metres of concrete, and 65 tons of steel rods in its construction. It could house a I50-mm gun. It took two years to complete, and then the command bunker and other installations followed. The other casemates were Type 669s and used less material - 450 cubic metres of concrete and only 20 tons of steel.
Reply With Quote Top
Reply

LinkBacks (?)
LinkBack to this Thread: http://www.war44.com/forum/merville-battery/63-merville-battery.html
Posted By For Type Date
Merville Battery [Archive] - War44 This thread Refback 02-18-2008 03:20 PM
Merville Battery - War44 This thread Refback 10-05-2007 01:21 PM


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


All times are GMT +1. The time now is 08:41 PM.


Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.1.0 War44