Results 1 to 2 of 2

Thread: Merville battery

  
  1. #1
    Jim's Avatar
    Jim is offline Admin
    Join Date
    Sep 2006
    Posts
    3,021
    Downloads
    55
    Uploads
    80

    Merville battery

    Impossible mission for the British parachutists

    The 9th Parachutist Battalion dropped in Normandy on 6 June 1944 under the cover of darkness. Lieutenant-colonel Otway trained his troops for months to take the Merville battery. The parachutists knew every detail of the German defences. On D-day the operation began in a tragic way : many parachutists drowned in the marshes, the wind scattered the men on a wide area and the main part of the heavy equipment was lost. However the Red Devils launched the attack, they conquered the blockhouses of the battery one after the other. At 5:00 am all was finished, the parachutists took a layback position in Le Plain and Le Hauger. In this area the 6th Airborne Division renewed with the Operation Paddle on 17 August. The Belgian Brigade under Colonel Piron captured the strongpoint of le Moulin du Buisson and reached Merville and Franceville, cleared of enemy. In the evening the Belgian stopped in front of Le Home still occupied by the German troops. Le Home is liberated the next day on 18 August.

  2. #2
    Jim's Avatar
    Jim is offline Admin
    Join Date
    Sep 2006
    Posts
    3,021
    Downloads
    55
    Uploads
    80
    The battery commander was Leutnant (2nd Lt) Raimund Steiner, who spent much of his time at an observation post on the coast; his second-in-command was Oberfeldwebel (Sgt-Maj) Hans Buskotte. Casemate No I was a Type 611 and consisted of the gun housing, access corridor and two ammunition stores (one for shells and one for cartridges), a shelter for 9 artillerymen, a gas extraction chamber and a machine-gun embrasure covering the rear. It was 15.5 m long and required over 1,330 cubic metres of concrete, and 65 tons of steel rods in its construction. It could house a I50-mm gun. It took two years to complete, and then the command bunker and other installations followed. The other casemates were Type 669s and used less material - 450 cubic metres of concrete and only 20 tons of steel.

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197